Injection Molding

Production Capabilities
Mold Tooling

Design, DFM review, and aluminum or steel tooling.

Material Selection

Commodity to high-performance resins with full certifications.

Short-Run Production

Low-volume pilots and bridge tooling strategies.

Quality Control

FAI, dimensional reports, and sampling plans on request.


Typical Lead Times

Tooling: 3-6 weeks · Production: 2-4 weeks

Ideal for

Repeatable, high-quality parts with consistent unit cost.

Secondary Services
Post-processing

Assembly, inserts, ultrasonic welding, and finishing.

Packaging

Custom packaging, labeling, and logistics coordination.

Request a Manual Quote
What to Provide
  • 3D model or 2D drawing package
  • Target resin and surface requirements
  • Estimated annual usage and schedules